Bryn Blaen Windfarm

Njord Ltd were installing a wind farm at Bryn Blaen and DKAN Groundworks were contracted to excavate trenches for just over 15km of high voltage cables (cables to be laid / pulled by the power company).  A trenching machine was utilised for a percentage of the works which involved excavation in and alongside the main A470 highway and across remote rural landscapes.  Ducts were laid where necessary.  

Client: Njord Energy

Principal Contractor: Neath Ltd

Start Date: September 2017

Duration: 24 Weeks

Groundworks Contract Value: £25k